Three-Phase Approach

Each phase builds on the last. Skip one and you're designing blind.

1

Predictive

RF modelling before any hardware is ordered. AP placement, channel plan, and coverage simulation against your floor plans and construction materials.

2

Active

Survey during commissioning. Real-world signal measured against the predicted model. Adjustments made before walls close and ceiling tiles go up.

3

Validation

Post-deployment certification. Heat maps, coverage report, and channel plan confirmation — your sign-off document that the design works as specified.


Deliverables

RF heat maps (per floor/zone)
AP placement report
Channel plan
Coverage certification report

Site Survey is a recommended pre-step before any WiFi deployment engagement. Skipping it means designing blind — placing APs based on assumptions rather than measured RF behaviour. We strongly recommend completing at least the predictive phase before committing to hardware orders.

Know your RF environment before you deploy.

Request a Site Survey Quote